Return to the main V-O-Cal page.
Help V-O-Cal by making a donation.
Who is V-O-Cal? - News, FAQ's, Contact
V-O-Cal funding and work partners
V-O-Cal programs: Team-Building, Training, Service Learning
Learn about V-O-Cal projects. (Schedule, history, photos, FAQs)
Get more info about volunteering.(How, why, history, photos)

Project Sponsors:

Calero County Park

Santa Clara County Parks

May 19, 20,21, 2016

calero county park

Project Background

Situated in the eastern foothills of the Santa Cruz Mountains, at the southern end of the Almaden Valley, 4,442 acre Calero County Park is part of the rolling hill country that dominates the eastern and western edges of Santa Clara County. Approximately 10 miles south of San Jose’s city center, the park is also within close proximity to communities further south such as Morgan Hill and Gilroy.

Santa Clara County Parks recently embarked on a Calero County Park trails expansion plan to expand its 20 mile trails network to over 36 miles, including 26 miles of multi-use trails. The Cottle Trail, when finished, will be a new 7 trail loop accessible from the new Rancho San Vicente Staging Area, scheduled to open on June 3rd.

Trail Description
V-O-Cal will be helping to build a new mile of the Cottle Trail.

Level of Effort

Center Camp

Carpooling, Parking

Driving Directions
Preliminary Schedule
Friday
5pm - Registration and camping opens
Saturday
7:30am - Registration, light breakfast, and lunch prep begin.
8am - Morning greeting, announcements, stretching and safety talk. Project begins.
12:30pm - Break for lunch on trail.
3:30pm - Head back to camp.
4pm - Drinks, appetizers and socializing. Showers available.
6:15pm - Dinner and entertainment.
Sunday
8am - Registration, hot breakfast, and lunch prep.
8:30am - Morning greeting, announcements, stretching and safety talk. Project begins.
11:30am - Break for lunch on trail.
1:30pm - Head back to camp to pack gear and truck.
2pm - Celebrate the work and say goodbyes.

What to bring and wear
For your safety and protection from hazards, please be prepared with the following items:

  • Water, sun hat, and sunscreen. You will NOT be allowed on the trail without a water container.

  • Bathing suit for swimming in the river
  • Plates, utensils, coffee mug and a cup.
  • Work Gloves (if you do not have work gloves V-O-Cal can provide a pair to use).
  • Sturdy shoes or boots with tread. Working in sandals or open-toed shoes will not be permitted.
  • Day pack to carry water and lunch.
  • Sunglasses.
  • Insect repellent or Mesh insect hat, allergy medicine, etc.
  • A change of clothes for each work day and for lounging at camp to minimize the spread of poison oak.
  • IF CAMPING: bring a tent, sleeping bag, folding chair, flashlight, and other camping gear. A coffee mug is also necessary. Also bring a change of clothes.

Meals
V-O-Cal provides all meals for volunteers from breakfast Saturday through lunch Sunday. Vegetarian options are available for all meals.

  • Please bring your own reusable plates, coffee mug, cups and utensils. To minimize waste from our projects, we ask that you bring your own dishes. Hot water and soap are provided.
  • A continental breakfast is served Saturday morning.
  • Lunch is prepared before hitting the trails. You break for lunch on the trail around 12:30.
  • Please arrive at camp by 7:40am to register, eat breakfast and prepare your lunch.
  • Appetizers and beverages will be available at 4pm after the work day on Saturday. Dinner will follow at 6:15pm.
  • Hot breakfast is served Sunday.

Hazards
HYDRATION/SUN EXPOSURE: The work site is exposed and it may be HOT. Wear a sun hat! Please drink plenty of water throughout the work day. If you feel tired or weak, let your crew leader know and take a break.
POISON OAK: There is a risk of exposure to poison oak at at the work site. Have your crew leader point some out to you if you don't know what it looks like. Clean with Tecnu after the workday and be cautious when handling your dirty clothes.
SNAKES: Snakes are present on the property. Use caution when walking the trails and when picking items up off the ground.
TICKS: Ticks are always a hazard so it is important to check during and after the project.
SHARP TOOLS: Please listen to your crew leaders tool safety talk and observe proper tool use throughout the day.

View other V-O-Cal Projects